Log-in lemu.dk

Your access to more than 300,000 different products and a wide range of services

Enter your e-mail address and have your password sent to you:

Cancel
en

Lindab roof flashing unit TGF 200 0°

Lindab Ventilation
{{StockInfo.NotAllowedReason}}
{{stck.StockInfo.RemoteStockLocation.DisplayName}} {{stck.StockInfo.RemoteStockLocation.Amount|number}} {{stck.StockInfo.RemoteStockLocation.Uom}} ({{stck.StockInfo.RemoteStockLocation.DeliveryTimeTxt}})
{{stck.StockInfo.CentralStockLocation.Amount|number}} {{stck.StockInfo.CentralStockLocation.Uom}} {{stck.StockInfo.CentralStockLocation.DisplayName}}
{{stck.StockInfo.CentralStockLocation.DisplayName}} (In stock)
{{stck.StockInfo.CentralStockLocation.DisplayName}} (Not in stock)
{{stck.StockInfo.CentralStockLocation.DeliveryTimeTxt}}
[{{stck.StockInfo.PrimaryStockLocation.DeliveryTimeTxt}}]
{{stck.StockInfo.NotCentralStockDeliveryTimeMsg}}
{{stck.StockInfo.SecondaryStockLocation.DisplayName}}: {{stck.StockInfo.SecondaryStockLocation.Amount|number}} {{stck.StockInfo.SecondaryStockLocation.Uom}}
Special return conditions

Product description

Type no.:
LM no.:
Own product no.:
775860
352881200
-
Discount code:
UNSPSC Code:
Customs code:
1122023249601
40101506
73079980
Acc. DS 428.4 "Standard for fire-fighting measures in ventilation systems", roof penetrations shall be provided with min. 50 mm insulation, ie the pipe installed through TGF must be insulated with a minimum of 50 mm. Enter roof slope a when ordering. Max. 55 °. Note: TGF is factory sealed tightly around the pipe. Before mounting, the joint must be checked for any damage that may occur during transport and handling. After installation, the joint must also be checked for possible damage caused by the assembly. Joints that are subject to heavy stress (eg wind) can become overloaded and, in the worst case, become leaky. Therefore, it would be a good idea to check these at intervals, eg every two years.

None

;